Selection of Welding Equipment for Long-Distance Pipeline Construction : Xionggu Project Case

Release Date: May 27, 2026

In May, the first section of the Yulin-Xi'an Gas Transmission Pipeline Project (Phase I) officially commenced construction, marking a critical milestone in the development of Shaanxi's natural gas trunk pipeline network. As the designated supplier of welding equipment and technical support for this project, Chengdu Xionggu Jiashi Electrical Co., Ltd. extends its sincere congratulations! 

Xionggu.jpg

With 34 years of dedicated expertise in pipeline welding and over 200 patents to its name, Xionggu has proven its capabilities on landmark projects including the Shaanxi-Beijing Fourth Pipeline. We deliver full-range welding equipment and comprehensive technical support for this initiative. 

1. Project Overview (First Section)

Total pipeline length (Yichuan Section): 31.89 km

Pipe specification, material and wall thickness: D1016mm, X70M, 14/16.8mm

Design pressure & annual gas transmission capacity: 8 MPa, 6 billion standard cubic meters

Laying scheme: Single pipeline adopting X70M steel pipe with internal coating; 3LPE anti-corrosion coating applied to pipelines

2. Xionggu Welding Solution

Tailored to the stringent requirements of D1016mm X70M steel pipes and the 8 MPa high-pressure operating condition, Xionggu adopts a combined process of TIG root welding + automatic welding for fill and cap passes, perfectly suited for all-position welding in field environments.

2.1 Core Equipment Configuration

Xionggu TIG Welder: Used for root welding to ensure 100% penetration of weld roots with no porosity or slag inclusions, ideal for welding high-grade X70M steel.

Xionggu A-305 All-Position Automatic Welder: Single-torch design completes hot pass, fill passes and cap pass in one continuous process. It operates reliably under extreme temperatures ranging from -40℃ to 55℃.

2.2 Key Process Advantages

Weld pass rate: Over 98% for first-time inspection

TIG root welding: Achieves single-sided welding with double-sided formation, delivering uniform root penetration and eliminating incomplete penetration defects.

A-305 Automatic Welder: Equipped with a built-in professional welding database and automatic seam tracking system, enabling precise adjustment of current, voltage and travel speed.

Weld performance: Tensile strength and impact toughness fully comply with X70M steel standards, meeting the demands of 8 MPa high-pressure service.

Root welding speed: 9–11 cm per minute for automatic root welding.

2.3 Field Adaptability & Operational Safety

Lightweight design: The A-305 welding carriage weighs merely 15.8 kg, allowing flexible operation in confined spaces.

Intelligent control: Preloaded welding parameter databases simplify operation via remote control. It reduces labor intensity, minimizes manual intervention and ensures consistent welding quality, while lowering exposure risks from arc radiation and welding fumes.

Superior environmental resistance: With an IP54 protection rating, the equipment withstands temperatures from -44℃ to 55℃, adapting to the complex terrain and harsh climate of the Northern Shaanxi Plateau. 

West To East Pipeline (WEP) Project (UAE).jpg

3. Xionggu Strength & Credentials

3.1 Proven Track Record on National & Overseas Projects

Xionggu holds a market share of over 70% in China’s long-distance pipeline automatic welding sector. Our equipment has been deployed on numerous overseas projects including the Saudi Master Gas System Phase 3 Project, UAE West-to-East Pipeline Project and Sinopec Jizan Refining Project in Saudi Arabia,The 5th gas pipeline in Thailand,The 4th West to East China gas pipeline,The 3rd West to East China gas pipeline,The 2nd gas pipeline from Sichuan province to East China.All projects maintain a first-time weld pass rate above 98% and have earned high recognition from clients worldwide.

3.2 Technical & After-Sales Support

R&D team: More than 150 professional engineers, holding over 200 technical patents.

On-site technical service: Senior welding engineers provide full-time on-site support, covering equipment commissioning, process guidance and maintenance services.

Rapid after-sales response: Technical solutions confirmed within 24 hours, and on-site service available within 72 hours to guarantee uninterrupted project construction. 

The 5th gas pipeline in Thailand.jpg

As a leading brand in China’s pipeline automatic welding industry, Xionggu leverages 34 years of technical expertise, rich experience in national key projects and end-to-end service capabilities. We are committed to delivering zero-defect welding quality, high construction efficiency and reliable technical support to safeguard pipeline operational safety. Xionggu will fully support the project to achieve high-quality, efficient, safe and eco-friendly construction.

【Tags】Welding Equipment for Long Distance

【editor】All rights reserved by XiongGu. Please indicate the source when reprinting

Leave A Message Request A Free Quote
For more product details and new products, please leave a message.We'll reply quickly!

By clicking 'Agree All', you agree to the storage of cookies on your device to enhance sitenavigation, analyze site usage and assist with our marketing efforts.